OSAF Weekly Status 21 April 2006

This report covers the period from Apr 15-Apr 21 2006 (one week).

Highlights

  • Chandler
    • Wrapping up alpha2 work: fixing bugs, testing and logging more bugs, etc.
  • Cosmo
    • Migration tool is done has been tested with live data.
    • Wrapping up 0.3 and starting to plan for 0.4
  • Scooby
    • Scooby 0.2 is underway and is making great progress.
    • Discussions about JavaScript frameworks are ongoing on the list.
  • OSAF

Design and PM (Sheila)

Progress:

  • Chandler
    • Repriortization of dogfood bugs in prep for alpha 3
    • Alpha 3 design work - lozenge design, markup bar icons, sidebar icons
    • Started drafting detailed alpha 3 plan and specs
    • Alpha 2 data migration plan
  • Scooby
    • Continued work on Scooby 0.2 specs and designs
    • Scooby 0.1 landing page - finishing up

Plans:

  • Chandler
    • Alpha 3 work, nail down perf scenarios
    • Alpha 2 non-code release planning
    • 1.0 plan - various posts to the list pending
  • Scooby
    • Priscilla finishing Scooby 0.2 design work prior to vacation

Application WG (Philippe)

  • Progress
    • Lots of bugs fixed though more bugs are being filled by a very active QA team
  • Plan
    • Team will be focusing on fixing bugs, write functional tests and help others get stuff in alpha2
    • John focusing on fixing the wx issue
    • David on wxColumnHeader integration
    • Reid to land his markupbar next week

More details available in AppsMeeting20060420

Platform WG (Katie)

  • Progress
    • Bug:3521 fixed: body type changed from Lob to Text
    • Decided to add "title" attribute for Bug:1745, but not in alpha2
    • i18n roadmap email
    • Lots of background sync debugging, fixes not yet committed
    • Repository fixes for bugs revealed by background sync
    • Backwards compatibility fixes for 0.6 <--> alpha2 sharing
    • Recurrence/timezone bug investigations and fixes: Bug:5598, Bug:5673, Bug:5621, Bug:5715
  • Plans
    • Commit background sync
    • 0.7alpha2 bug fixes

More details available at PlatformMtg20060418

QA, Build and Release (Heikki/Aparna)

  • Plans:
    • Continue testing alpha2 features on the trunk
    • Test the cosmo 0.3 release candidate once it is available

Cosmo and Scooby (John)

Progress:

  • Cosmo
    • Migration tool is done has been tested with live data. We found a couple of issues with bad accounts, but otherwise everything is working well.
    • All but one open bug has been fixed for 0.3. We hope to have the last bug addressed by 4/26 (wed of next week)
    • Started thinking for next release. Bugzilla bugs have been assigned. More work to do here.
  • Scooby
    • Scooby 0.2 is underway and is making great progress.
    • Discussions about JavaScript frameworks are ongoing on the list. Bobby, mde, and towns have been spending some time prototyping some functionality in Dojo and Prototype. We're planning to have lunch with Alex from the Dojo Foundation next week.
    • Jeremy Epstein (disclosure: Priscilla's husband) stopped in and demoed some of his work for us. He is interested in volunteering some of this time to work on Scooby. The Mini-calendar is a likely candidate for him to look at.

Plans:

  • Cosmo
    • Fix last bug.
    • Get 0.3 release candidate into QAs hands this week (4/26)
    • Complete first draft of 0.4 release plan.
    • Think about the Vision of Cosmo going forward.
    • BCM is going to be out for most of June. We need to think about coverage of responsibilities during his vacation.
  • Scooby
    • Continue to work on Scooby 0.2
    • Continue work on JavaScript frameworks issue.
    • Write up specs for 0.2.
    • Get discussions going on the mailing list for Scooby 0.2 features that need more discussion.
    • Work with Jeremy Espstein on the his mini-cal work.
    • Continue our discussions and work on the JavaScript framework decision.
    • Prepare list of Scooby projects for Google Summer of Code.

IT (Jared)

Progress:

  • High rate of wiki
  • VPN fine tuning for Mac and outbound connections
  • OSAF IT projects list prepared
  • Scooby-demo made available internally
  • wiki upgraded to mod_perl for a performance boost

Plans:

  • Talkback infrastructure development

Community (Pieter/Ted)

Progress:

Plans:

    • Work with people to get GoogleSummerOfCode2006 page filled in
    • OsafProjectRoles
    • Work with mde, bcm, and towns to complete formatting work on cosmo and scooby sites.
    • Work with towns and bcm to populate the Cosmo FAQ
    • Meet with Blue and C.D. to organize the catering for Core Sprint Week.
    • Meet with Esther, Greg, Creative Commons, and Topaz to organize for the social night as part of Core Sprint Week activities.
Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r9 < r8 < r7 < r6 < r5 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.