Weekly Report - February 29-march 6

Generated 8Mar2004 3:00 pm Grouped by Projects

February 29th - March 6th  
Project : Categories / Higher education
PersonGoalStatusPlanned this weekProgress this week
Pieter HartsookWork on draft of questions to present as a survey to NITLE schoolsIn progressWork on draft of questions to present as a survey to NITLE schools. Goal is to validate any differences in requirements, usage, administration, or use from CSG schools.


Run draft by Chao and Mitch early next week.

Send to Scott to distribute as a survey in mid-February.

Chao, responded with suggestions. Clara Yu's office responded with suggestions and a distribution list. We should field this next week.
Chao LamReview NITLE survey status with Pieter CompletedReview NITLE survey status with Pieter. Read Pieter's docsdone
Project : Categories / Product design
PersonGoalStatusPlanned this weekProgress this week
Chao LamTransform Design Map into to do list for design teamIn progressMake next rev of design map. First draft of design map of to do list such that all important design team issues are tracked with next actions as appropriatedone, ready for discussion next Monday
Chao LamWork with Brian and rest of design to arrive at Design uniform document templates and organizationIn progressMeet up with Brian, and also apps team. Assist Brian as necessary
Chao LamWrite up first draft on requirements for sharing notificationNot startedWrite up first draft on requirements for sharing notification (time permitting)
Brian SkinnerDesign docsIn progress(+) Get started on the Calendar design doc, if time permits.

(+) Write up notes from design meetings on 12 Feb, 17 Feb, and 19 Feb. Include lists of action items and open issues.

(+) Finally typed in all my old notes from design meetings on 12 Feb, 17 Feb, and 19 Feb. Filed notes on appropriate pages: UnfiledDesign2004, Projects.ContentModelProject, Trash.DesignToDoList?, Jungle.BrianDouglasSkinnerToDoList, etc.

(+) Did not get started on the Calendar design doc revision.
Brian SkinnerDesign meetingsIn progressDesign meetings on Monday, Tuesday, and Thursday.(+) Done. Design meetings on Monday and Thursday. (No meeting on Tuesday.) Notes from the Thursday meeting are posted on Journal.DesignGroupMeeting20040304.

(+) Read through Heikki's PKI docs in preparation for meetings next week.

Brian SkinnerTemplate for design docsIn progress(+) Meet with Chao and Jurgen about the status and schedule for our effort to get the EditTablePlugin? working.

(+) Start working my way through the list of tasks identified on the Trash.OsafLibraryProject? page.

(+) Update the Journal.FilingDesignArtifacts20031218 doc to reflect new decisions, or mark it as obsolete and figure out some other place to record lasting decisions.
(+) Met with Chao and Jurgen about EditTablePlugin? bugs and other wiki features. Also reviewed Ducky's Jungle.WikiRedesign page, reviewed the old 2003 bugzilla entries for wiki coding tasks, and opened a number of new bugs for wiki tasks (Bug#1362, Bug#1363, Bug#1364, Bug#1365, Bug#1366, Bug#1367, Bug#1368, Bug#1369)

(+) Met with Pieter and Ducky and signed off on Pieter's proposed modifications for the Glossary entry template.

(+) Did not do further work on Trash.OsafLibraryProject? to-do list items or on putting to rest Journal.FilingDesignArtifacts20031218.
Project : Chandler development
PersonGoalStatusPlanned this weekProgress this week
Mark JaffeInvestigation of Subversion as new SCM toolNot startedInvestigation of Subversion as new SCM tool
Mark JaffePrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.Not startedPrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.
Mitch KaporAct like a good development manager, especially to surface and deal with intergroup issuesIn progress.4 planning
interoperation project
"library" project
Project : Chandler development / Application
PersonGoalStatusPlanned this weekProgress this week
Katie ParlanteMeet with design team, design team will go over ui landscape for 0.4CompletedMeet with design team, design team will go over ui landscape for 0.4 Meeting with apps and design team, an overview of 0.4 ui.
Katie Parlante0.4 release planningIn progress(+) Meet with Chao

(+) Get input from John
(+) Make list of work items/projects (apps team and related)
(+) First pass at high level milestones

(+) Met individually with John and Chao
(+) A couple of 0.4 planning meetings
(+) Informal notes on high level milestones and full list of work items/projects, still need to work on this.
Katie Parlanteapps teamIn progress(+) meeting

(+) conversations with folks individually about tasks for 0.4

(+) meeting notes
(+) initial conversations, but we still have planning to do. Initial work is cleanup/bug fixes while we plan.
Katie ParlantewxWidgets transitionIn progresswxWidgets transitionJed will own the wxWidgets transition from the apps side, Mark from the release side. John and Morgen will help out where needed. We'll start after the 0.3.11 milestone. Will likely require a branch, for Jed and Mark to work together.
Project : Chandler development / Application / Content model
PersonGoalStatusPlanned this weekProgress this week
Jeffrey HarrisMaintain XSL files and related python code.In progressMaintain XSL files and related python code.
Brian SkinnerDrive towards having an initial PIM level Content Model.In progress(+) Be available if Jeffrey surfaces issues with the content model as he's working the Projects.ContentModelInteroperationProject. Likewise, be available if Stuart identifies e-mail content model issues.

(+) Hand off to Jeffrey whatever sample data that Mitch and Mimi come up with.
(+) A few IRC conversations with Jeffrey (and bear) about various issues that surfaced as he was working on Projects.ContentModelInteroperationProject. Skimmed through some of the import code, which looks good.

(+) Talked with Katie about Content Model ownership, and started cleaning up the Projects.ContentModelProject#Status to do list.

(+) No sample data to hand off yet.

Project : Chandler development / Capplets / Third party / Zaobao
PersonGoalStatusPlanned this weekProgress this week
Stuart ParmenterBuild Zaobao out of blocksIn progressBuild Zaobao out of blocks
Stuart ParmenterCleanup and polish ZaobaoIn progressCleanup and polish Zaobao
Project : Chandler development / Framework / CPIA
PersonGoalStatusPlanned this weekProgress this week
John AndersonLots of interviewsIn progressDid two more interviews. Still need to review code
John AndersonWrite List View. Make sure Tree works with unified designIn progress Wrote first pass of List and updated Chandler to use it
Project : Chandler development / Framework / Info management
PersonGoalStatusPlanned this weekProgress this week
Mimi Yin.4 planningIn progress Proposal for .4 workflows (subset of all workflow and component specs thus far).
Mimi YinStamping and CollectionsIn progress See documentation item above.
Project : Chandler development / Framework / Notification framework
PersonGoalStatusPlanned this weekProgress this week
Stuart ParmenterUpdate notification manager documentation on the wikiIn progressWill work on after feature freeze
Stuart ParmenterNotification Manager design reviewNot startedWill work on after feature freeze
Project : Chandler development / Framework / Parcel framework
PersonGoalStatusPlanned this weekProgress this week
Morgen SagenDebug John's additions to Bug#1144CompletedFix this.Have a partial solution checked in; an item can be defined in the same file as its kind, even if that kind has a "classes" assignment -- but if that kind has a superkind outside the xml file with a "classes" assignment then that doesn't work. Next step is to propose new parcel format, and this problem will go away.
Project : Chandler development / Framework / Repository
PersonGoalStatusPlanned this weekProgress this week
Mitch Kaporcoordinate repository working groupIn progressPyCon decision
Project : Chandler development / Framework / Repository / Data model
PersonGoalStatusPlanned this weekProgress this week
Ted LeungRepository Access Control/SharingIn progressOn hold till Andi returns

Look at selected chapters from capabook to make sure we're not missing anything.
Read chs 1 and 10 of Capability Based Computer Systems
Katie ParlanteWrite up data model issues (input for repository team working on data model)Not startedWrite up data model issues (input for repository team working on data model)Not done.
Andi VajdaMake data model wonderfulIn progressmake data model wonderful
Project : Chandler development / Framework / Repository / Persistence
PersonGoalStatusPlanned this weekProgress this week
John AndersonSolve the schema evolution problem as well as it was solved using ZODB in the previous design.In progressI may postpone this if I don't have enough time to work on it
Ted LeungGet a baseline view of repository performance.In progressre-profile write and read tests with Andi's tar file.


Work with bear to incorporate his investigations

Did a small investigation into repository footprint. Results posted to dev@

Something has broken the test again, but I haven't had time to see what.
Andi VajdaMake repository wonderfulIn progressMake repository wonderful
Andi VajdaRevive repository sharingIn progressImprove remote access protocol.

Take a look at webdav.

Project : Chandler development / Framework / Repository / Query
PersonGoalStatusPlanned this weekProgress this week
Ted LeungFlesh out QueryItem? APIIn progressWork with John to develop the API for QueryItem?Look at John's API and discussed by phone


Posted Summary to dev@

Ted LeungStart catching up on query literatureIn progressLook at papers by Buneman, Suciu groupsRead

Optmizing Regular Path Expressions Using Graph Schemas
Project : Chandler development / Framework / Security
PersonGoalStatusPlanned this weekProgress this week
Pieter HartsookWork on draft of questions to present as a survey to NITLE schoolsIn progressWork on draft of questions to present as a survey to NITLE schools. Goal is to validate any differences in requirements, usage, administration, or use from CSG schools.

Run draft by Chao and Mitch early next week.

Send to Scott to distribute as a survey in mid-February.
Chao, responded with suggestions. Clara Yu's office responded with suggestions and a distribution list. We should field this next week.
Katie ParlanteReview design team's security proposalIn progressRead and review on the train.Not done.
Heikki ToivonenContinue with Chandler Security Project: SecurityProjectIn progressCheck in build changes to get OpenSSL and M2Crypto building in Chandler. Work on creating and verifying certificates, and SSL connection.Crypto stuff not built by default, but everything is checked in. Worked on creating and verifying certificates.
Project : Chandler development / Framework / Sharing/Discovery
PersonGoalStatusPlanned this weekProgress this week
Katie ParlanteReview design team's sharing proposalIn progressWrite up initial feedback for chao and team.Not done.
Project : Chandler development / Framework / Third party / wxPython
PersonGoalStatusPlanned this weekProgress this week
Robin DunnWork on tools to extract the docstrings and detatiled docs from the SWIG XML output and put it into a simplified format that can be used for creating online HTML (or other formats) for wxPython reference documentation.In progressWrite a tool (coordinating with community volunteers) that uses the new XML format to build input for a standard Python documenter tool.


Evaluate Riaan's conversion script

Nothing done towards this goal this week
Robin DunnChapter reivews and editing for the wxPython book.In progressChapter reivews and editing for the wxPython book.No new chapters this week. Discussed where to go from here and similar.
Robin DunnWork on adding more docstrings for the SWIG gererated functions and methods.In progressWork on adding more docstrings for the SWIG gererated functions and methods.A few more classes documented
Robin DunnWork on bugs and other issues raised by the wxPython-dev testing group about the 2.5.1.0p8 preview.In progressWork on bugs and other issues raised by the wxPython-dev testing group about the 2.5.1.0p8 preview.* Fixed a bug in wxFileConfig that was causing trailing spaces in the keys be signigicant.

* Changed how the code is generated (using a typemap) for returning some types of GDI object references to actually create and return a copy instead. This is to help take advantage of the C++ copy-on-write code for these classes and to not trigger an incorrect optimization when trying to reuse the original object.

* Refactored wx.Timer wrapper so that it doesn't have to save a reference to itself.

* Chased down some wxMac issues and got details to Stefan so he could fix.


* wxVListBox: Fixed scrollbar problem with wxGTK2. Fixed how the wxNotebook applies bg colors to the child controls so the VListBox? doesn't get the wrong color. Fixed it so cursor keys could be used on Windows. Fixed it to use the right font on Windows.

* Fixed wxSplitterWindow to not depend on starting out with a very small size anymore.

* Removed some extra Refresh() calls in the demo that are not needed anymore.

Robin DunnWork on infrastructure changes (domain names, hosting configs, etc.) for changing the name of wxWindows to wxWidgets.In progressTry to get the SunSite?.dk changes for the mail lists completed and transition the users to the new names.The SunSite?.dk guy responsible fo rthe mail lists has been out of town...
Robin DunnWork on my OSAF bug listIn progressWork on my OSAF bug listNothing done towards this goal this week
Katie ParlantewxWidgets transitionIn progresswxWidgets transitionJed will own the wxWidgets transition from the apps side, Mark from the release side. John and Morgen will help out where needed. We'll start after the 0.3.11 milestone. Will likely require a branch, for Jed and Mark to work together.
Project : Chandler development / Meta projects / Documentation / Dev docs
PersonGoalStatusPlanned this weekProgress this week
Ted LeungBusy Developer's GuideNot startedIncorporate feedback from John Anderson

Work with Morgen to figure out how to align our two documents so that people get information in the best possible way.
Worked out a plan with Morgen


Started on content

Brian SkinnerCompleted Done
Project : Chandler development / Meta projects / QA
PersonGoalStatusPlanned this weekProgress this week
Mark JaffePrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.Not startedPrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.
Project : Chandler development / Meta projects / Releases
PersonGoalStatusPlanned this weekProgress this week
Mark JaffePrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.Not startedPrepare outline of preliminary QA processes relating to handoff from Release to QA Engineer.
Katie Parlante0.4 release planningIn progress(+) Meet with Chao
(+) Get input from John
(+) Make list of work items/projects (apps team and related)
(+) First pass at high level milestones
(+) Met individually with John and Chao
(+) A couple of 0.4 planning meetings

(+) Informal notes on high level milestones and full list of work items/projects, still need to work on this.

Katie ParlantewxWidgets transitionIn progresswxWidgets transitionJed will own the wxWidgets transition from the apps side, Mark from the release side. John and Morgen will help out where needed. We'll start after the 0.3.11 milestone. Will likely require a branch, for Jed and Mark to work together.
Project : Chandler development / Meta projects / UI design
PersonGoalStatusPlanned this weekProgress this week
Mitch Kaporfocus on key design issues intensivelyIn progressper Chao's meeting agenda
Katie ParlanteMeet with design team, design team will go over ui landscape for 0.4CompletedMeet with design team, design team will go over ui landscape for 0.4 Meeting with apps and design team, an overview of 0.4 ui.
Mimi YinLonghorn researchCompleted Done
Mimi Yin.4 planningIn progress Proposal for .4 workflows (subset of all workflow and component specs thus far).
Mimi YinDetail viewsIn progress First pass at component spec for Detail view.
Went over this in 1st Design / Apps team meeting
Mimi YinDocumentationIn progress Put together presentation for Staff meeting and first Design / Apps team meeting to give snapshot of where the Design team is thus far.


These are working spec documents for Canoga features. We are putting together a separate set of documents for .4. (See above in .4 planning.)

Design abbreviations

Workflow specs
Stamping
Explicit collections
Organizing items in a view
Building layouts


UI Component Specs
Sidebar
Summary table view
Detail view

Brainstorm of calendar ideas.

Mimi YinEntering workflowIn progressPropose sketches for creating new items. Linked and unlinked.
Mimi YinOther researchIn progress Looking into some knowledge mapping projects Pieter sent me.
cite project from Drexel
esi-topics
babylontee

Reading up on Heikki's PKI Proposal:

Dartmouth PKI Proposal
Intel PKI paper

Mimi YinStamping and CollectionsIn progress See documentation item above.
Mimi YinUser workflowsIn progressPin down and prioritize Canoga user workflows.
Project : Chandler development / Tools
PersonGoalStatusPlanned this weekProgress this week
Mark JaffeInvestigation of Subversion as new SCM toolNot startedInvestigation of Subversion as new SCM tool
Heikki ToivonenMeet with Mark Jaffe to set up goals etc.Not startedMeet with Mark Jaffe to set up goals etc.Some ad hoc meetings and goals, but no full picture for 0.4 and beyond yet.
Project : Chandler development / Tools / CVS
PersonGoalStatusPlanned this weekProgress this week
Mark JaffeInvestigation of Subversion as new SCM toolNot startedInvestigation of Subversion as new SCM tool
Mark JaffeRemove zodb from treeNot startedRemove zodb from tree
Project : Chandler development / Tools / HardHat
PersonGoalStatusPlanned this weekProgress this week
Mark JaffeInvestigation of Subversion as new SCM toolNot startedInvestigation of Subversion as new SCM tool
Morgen SagenFigure out why unit tests running under Linux require an X server.In progressLook into this -- solving this problem helps with epydoc generation as well.
Project : Community
PersonGoalStatusPlanned this weekProgress this week
Mitchell BakerAttend Larry Lessig's class on open source and contracts as a guess speaker during their class on the Mozilla Public License.CompletedAttend, hopefully have something interesting to say.Attended, it's always good to see Larry's thought process. Good discussion beyond the specifics of the license.
Mitchell BakerAttend Community Working Group meetingIn progressAttend, consider PyCon needs, 0.4 goals.Done for this week.
Mitchell BakerAttend Management Committee and All Hands Meetings; create and distribute notes from each.In progressAttend meetings. Create and distribute notes.Done for this week.
Mitchell BakerEvaluate the use of one or more Common Cause licenses for the content of the OSAF wikis. In progressProbably won't get too far in this this week. I think it's late to make the and 0.3 deliverable, but it could become an 0.4 community deliverable. Included licensing of website materials as a tentative 0.4 goal (all goals for the Community Group goals under discussion as part of 0.4 planning). Did an initial review of the Creative Commons license, have one question re liability clause.
Mitchell BakerHelp all working groups define a reasonable set of community related goals for the 0.4 release.In progressBegin a general discussion.Had a very brief discussion as part of management group 0.4 planning. Seems to be consensus on basic points: the CWG will have goals of its own to accomplish, and will also focus on goals applicable to the project and to various other working groups. In the latter case the CWG will both follow and lead. "Follow" in the sense that we will try to develop community goals that fit in and support the plans of the working groups. "Lead" in the sense that a healthy community is a feature goal for Canoga, and someone needs to be driving the development of that feature.


Began a discussion within the CWG of next steps for both aspects.

Mitchell BakerPeriodic discussions of community related topics at the All Hands and Management Committee meetings.In progressAgree on Management Committee topic (if any for this week) with Mitch. Give the agreed-upon update. Very brief discussion of community issues at the Management Committee meeting. Longer discussion within the CWG of proposed community discussion at the All Hands.
Jeffrey HarrisGo to PyCon to help with the Sprints and to talk about Chandler.In progressTalk to Ted about where to stay, make reservations.Made hotel reservations, bought plane tickets, registered. Talked to Ted.
Pieter HartsookFigure out how to record and present videos of Chandler demos to the community.In progressFigure out how to record and present videos of Chandler demos to the community.no progress this week, hope to have time to experiment with the screen capture using Windows Media Encoder 9.
Ted LeungCoordinate PyCon 2004 sprintsIn progressOngoingHad one new person sign up
Ted LeungPyCon 2004 logisticsIn progressMake arrangementsTravel and Hotel arrangements made


Obtained and updated freshmeat.net record for Chandler

Ted LeungCommunity WG 0.4 planningNot started Planning meeting

Review older community plan documents
Ducky SherwoodAnnounce, moderate, and post metrics for Office Hours.CompletedAnnounce, moderate, and post metrics for Office Hours.Done.
Ducky SherwoodAttend and post minutes of Community Working Group meeting.CompletedAttend and post minutes of Community Working Group meeting.Done
Ducky SherwoodFind users' groups in the DC area and send them info about the pycon sprints.Completed I have sent messages to people at the DC LUG, Montgomery County LUG, Columbia Area LUG, Baltimore-Washington Beowulf UG, the Laurel-Beltsville UG, and U. Maryland LUG. Sent messages to people at the ACM student chapters at the George Washington U, Johns Hopkins, and Virginia Tech. Sent email directly to the Northern Virginia LUG list.

People from LaurelLinux?, CALUG, and DCLUG responded, saying they'd posted to their list.
Ducky SherwoodWith Mitchell, reorganize community wiki areaIn progressWith Mitchell, reorganize community wiki areaHave collected a list of internal and external docs. Looking over to see which ones look like they can move to public, which are obsolete, etc. Thinking about how to organize them.
Ducky SherwoodAdd the "bugs closed". Add "# downloads" and # patches" if I can get that information programmatically.

Need to add Lines Of Code committed per week.


Need to add bugs closed.

In progressMight get to this this week.
Ducky SherwoodFix unknown bug in metrics code that under-reports mailing list activity.Not startedFix unknown bug in metrics code that under-reports mailing list activity.
Project : Community / Wiki
PersonGoalStatusPlanned this weekProgress this week
Jurgen BotzDebug TWiki EditTablePlugin?In progress Made some progress in in mapping data flow
Pieter HartsookExplore solutions for managing local translations of Chandler documents (website pages, Wiki pages, developer docs, etc.)Not startedGet in touch with open office folks to get details of how they manage the various regional translations of documents.no progress this week - this is a low priority, back burner item probably until the 0.5 release timeframe, but it will be good to have background information collected as we move forward.
Ducky SherwoodAs per meeting with Brian and Pieter, make some wiki changes:

+ make it clear that Main is not the main page, that Projects is
+ add a link to the glossary
+ mention in style guide about capitalization of glossary terms and single-word-ness
Completed Changed text on Main to send people to Projects and asked Jürgen to change wiki.o11n.org to point to Projects.

Added a link to glossary; updated the style page.
Ducky SherwoodMake a HackingChandler? page with useful information about our procedures.In progress Started gathering existing documents.
Project : Marketing
PersonGoalStatusPlanned this weekProgress this week
Pieter HartsookWork on draft of questions to present as a survey to NITLE schoolsIn progressWork on draft of questions to present as a survey to NITLE schools. Goal is to validate any differences in requirements, usage, administration, or use from CSG schools.


Run draft by Chao and Mitch early next week.

Send to Scott to distribute as a survey in mid-February.

Chao, responded with suggestions. Clara Yu's office responded with suggestions and a distribution list. We should field this next week.
Project : Marketing / Events
PersonGoalStatusPlanned this weekProgress this week
Mitchell BakerPrepare outline for presentation to the NWACC Annual Retreat, June 16-18.Not startedNot sure I'll get to the outline this week; the week is looking busy already.None.
Project : Marketing / Marcomm
PersonGoalStatusPlanned this weekProgress this week
Pieter HartsookReview, coordinate, post 0.3 non-dev documentation including announcements.CompletedReview, coordinate, post 0.3 non-dev documentation including announcements.should have marked this a completed last week - oops.
Pieter HartsookFigure out how to record and present videos of Chandler demos to the community.In progressFigure out how to record and present videos of Chandler demos to the community.no progress this week, hope to have time to experiment with the screen capture using Windows Media Encoder 9.
Pieter HartsookRespond to email enquiries and requests, keep the website updated, post status manager reports, etc.In progressRespond to email enquiries and requests, keep the website updated, post status manager reports, etc. Email that comes to info @ osafoundation.org as well as to Mitch. ongoing task
Pieter HartsookWork on the bi-weekly Status Update report for the website, Wiki, and dev maillist.In progressGet the darn report out the door.
Pieter HartsookExplore solutions for managing local translations of Chandler documents (website pages, Wiki pages, developer docs, etc.)Not startedGet in touch with open office folks to get details of how they manage the various regional translations of documents.no progress this week - this is a low priority, back burner item probably until the 0.5 release timeframe, but it will be good to have background information collected as we move forward.
Heikki ToivonenThe website developer section could be better; write proposal to Pieter. Also builds.osafoundation.org should have more information on it. In progressWrite proposals, and in the case of builds maybe modify it myself. We should get more developer tools links on builds.No progress.
Project : OSA Foundation / HR
PersonGoalStatusPlanned this weekProgress this week
Mitchell BakerFinish Minimum Continuing Legal Education and bar dues requirements.In progressfigure out cost of dues and MCLE materials.got the expense report for the dues; need to assemble expenses for the MCLE materials.
Mitchell BakerWork with Ducky to make the best use of her time in the community arenaIn progressDefine tasks for this week.Done for this week.
Morgen SagenHelp Mark get up to speed on our infrastructureIn progress Handed the build machines over to Mark; showed him how to run the tinderbox clients.
Brian Skinnerperformance reviewsIn progressFill out one of my five performance review forms.Done. One down, four to go.
Project : OSA Foundation / HR / Hiring
PersonGoalStatusPlanned this weekProgress this week
Brian SkinnerHiringCompleted Done
Project : OSA Foundation / Legal
PersonGoalStatusPlanned this weekProgress this week
Mitchell BakerBegin preparing documents and processes OSAF will use to accpet code from non-employees for inclusion as Chandler specific code into the OSAF tree. (Chandler-specific code means code written for Chandler, not code in existing projects which we use.)Not startedLook at Apache contributor license to see if this will work for OSAF.Didn't get to this.
Project : OSA Foundation / System administration
PersonGoalStatusPlanned this weekProgress this week
Jurgen BotzUpdate staff picturesCompleted done
Jurgen BotzUpgrade bugzilla to 2.17.7 and resolve a bunch of outstanding tickets about bugzilla (graphing, performance, etc.)In progress Upgrade done, closed 70% of outstanding requests
Jurgen BotzZero SpamIn progress- Implement greylisting as a subroutine in mimedefang

- Implement DSPAM
- provide UI for DSPAM training

- experiments with original greylisting code, found incompatibilities with RH9 perl; determined that upgrading perl on RH9 would be too tricky, but wanted to implement this in mimedefang anyway
- found someone elses mimedefang subroutine, rewrote to use mysql; 50% finished
- played with DSPAM
Project : OSA Foundation / System administration / Server
PersonGoalStatusPlanned this weekProgress this week
Jurgen BotzBig file server for backupsIn progressWork with Chris to get one of the remaining VA boxes runningChris got one of the boxes up; we need to get another IDE controller and a riser card to install it
Jurgen BotzInstall nutch and use to index OSAF sites (including twiki)In progress installed all of the prerequisites
Heikki ToivonenCheck on Bugzilla release schedule and talk to Jurgen about updating our installation with the yet-to-be-released new Bugzilla.Completed Jurgen updated Bugzilla, I posted note to dev.
Project : OSA Foundation / System administration / Status manager
PersonGoalStatusPlanned this weekProgress this week
Jurgen BotzMove Morgen's status manager to KahunaIn progresscomplete transfer this weekset up mysql on kahuna
Pieter Hartsookcreate a FAQ entry for the Status Manager tool for using the Summary flag.In progresscreate a FAQ entry for the Status Manager tool for using the Summary flag.
Project : To be assigned
PersonGoalStatusPlanned this weekProgress this week
Jeffrey HarrisCreate functionality to import/export Chandler data to standard formats, with special emphasis on Outlook.In progressTalk to Morgen about getting the csv module to work on Windows.

Add an item to the Test menu to import a CSV file, also an item to delete all Contacts in //userdata/contentitems, to make testing easier.


Figure out why I can't see the created Contacts from Chandler's UI.

Talk to Andi about possible oddities with interacting with the repository.

Test more complicated data sets.

Mark got the csv module working, unfortunately the Windows automatic debug build wasn't working, so debugging was a little tough.

Tested import code, tightened it up, made docstrings use epytext. Added a menu item to import CHANDLERHOME/contacts.csv. Updated Contact display code to not choke when a name or phone number doesn't exist for a contact.

Had a long conversation with Brian about what's important to add to the Contact schema, what should be imported, and which Outlook fields can be ignored.
Jeffrey HarrisLet people know my schedule for the week. I'm in Central (GMT -6:00).In progressMonday - All day
Tuesday - other work
Wednesday - All day
Thurdsay - other work
Friday - Afternoon
Jeffrey HarrisThink about XML-RPC/SOAP and REST interfaces to get data from and into the repository.In progressSee if I can write a quick hack as a demonstration in under an hour (low priority).Didn't think about it.
Jeffrey HarrisWork on the Sample Data ProjectNot startedGet a small amount of data from Brian, turn it into parcel.xml files.Haven't gotten sample data.
Chao LamDesign Meeting: Go through MImi's UI landscape docs with apps and design teamsCompletedDesign Meeting: Go through MImi's UI landscape docs with apps and design teamsdone
Chao LamDiscuss with Katie, and then apps and design team how best to plan and implement 0.4 going forwardCompletedDiscuss with Katie, and then apps and design team how best to plan and implement 0.4 going forwardDone
Chao LamWrap up sharing issues at design meetingIn progressWrap up sharing issues at design meeting (probably won't get through this week, working on UI landscape first)
Brian Skinnerunified project listCompleted(+) Meet with Mimi Monday about how to integrate the ProjectOverviewTable2005 with the Trash.UIDesignArchive? page and the "User Scenario's Framework", and to work on unified templates for design docs and UI design docs.
(+) Met with Mimi (and Chao) on Monday. Notes are available at Journal.DesignGroupMeeting20040301.

(+) Quick follow-up meetings with Chao about the Monday proposal and about the Trash.DesignToDoList?.
Mimi Yin.3 t-shirtIn progress Sent artwork to Pieter.
Mimi YinReviewsIn progress Half way done.
Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r7 < r6 < r5 < r4 < r3 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.