r1 - 27 Oct 2003 - 11:28:00 - KatieCappsParlanteYou are here: OSAF >  Journal Web  >  StatusReports > IndividualStatusReports > KatieCappsParlanteStatusReports > KatieCappsParlanteStatus27Oct2003

Overview

Still plugging away at parcel/item loading infrastructure, slowed down by sickness last week. Work on a strawman/first pass schema is heating up and I hope to get this work checked in as parcels. Its going to be a bit ugly as we transition from the old (viewer parcels) to the new (document architecture), but looking forward to getting to the other side.

Last Week (Oct 20)

plan actual
Parcel loading, item loading (Bug#904, Bug#892, Bug#856, Bug#672) Made progress on dependency loading, etc. Hope to check in and polish off for the milestone.
Meet with Mimi to talk about calendar design Postponed to this week
Meet with Mitch, Chao and Mimi to talk about calendar priorities Postponed to this week
Meet with Mitch, Chao, Ducky and Mimi to talk about email priorities Postponed to this week
  Ongoing repository and data model conversations
  Slowed down by sickness last week

This Week (Oct 27)

  • Parcel loading, item loading (Bug#904, Bug#892, Bug#856, Bug#672)
  • Milestone 0.3.01
  • Meet with Mimi to talk about calendar design
  • Meet with Mitch, Chao and Mimi to talk about calendar priorities
  • XSLT infrastructure in build (Bug#848)
  • Start rationalizing CoreSchema, common schema into build (Bug#898)

-- KatieCappsParlante - 27 Oct 2003

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r1 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.