Draft initial design page for Cosmo and Scooby (CALDAV client UI) with Brian's help - IN PROGRESS (meeting 04/26/05).
Work with Brian to validate Cosmo goals and sharing spec.
Spec drafts
Sharing spec - draft #3 due by 04/29 with updates on UI and architecture.
Detail View spec - reviewed outline and goals with Bryan, first draft done (REVISIONS IN PROGRESS)
Recurrence UI spec - follow-up meeting to discuss outstanding issues 04/25 - update spec with stamping scenarios (due 04/29).
Calendar spec - draft #1 - IN PROGRESS.
Sidebar spec - IN PROGRESS.
App Polish spec - IN PROGRESS.
Discussions this week
Sidebar meeting and prep for discussion 05/09.
Recurrence spec review 04/25 - DONE.
Talk to Alec, Philippe and John about short-term calendar goals -> colors, overlays and dependencies - DONE
Meeting with Ted about Item Collections spec, what he needs from design and things not yet nailed down for 0.6 ie:sidebar, my calendar collection - DONE
Reviews
Mimi's formal review 04/27.
Weekly architecture meeting with Katie - discuss any issues.
Mimi's Status
Working with John on Sidebar bugs, in particular, checkboxes for overlays this week.
Working with Jed on minical bugs and beveling improvements across the app.
Working with Alec on gradients
Meeting with Mitch re: D-conference presentation
Working through date/time and calendar navigation scenarios with Sheila