r15 - 18 Sep 2006 - 13:40:09 - TedLeungYou are here: OSAF >  Journal Web  >  ServerMeetingNotes > CosmoMeeting20060914

Cosmo Engineering Meeting 14 Sep 2006

Agenda

  • QOTF: What can we do to improve our velocity?
  • Hiring
  • 0.5 date
  • Magic URLs
  • Sticky plan
  • General coordination discussion

Notes

  • QOTF:
    • Mikeal - hiring people
    • Jared - time based releases; cut alphas earlier; don't lock ui and server alphas together
    • Brian - things will naturally speed up now that we have the big infrastructure items out of the way
    • Matthew - having all the merge stuff done will help a lot
    • Mikeal - making sure that we don't have dead time - people waiting for stuff to do.

  • 0.5 date
    • still looking at last week of September first week of October for development to finish features
    • then add about 2 weeks for testing (Mikeal's number)
    • have a bunch of folks out at Calconnect 9/26-9/29 which may impact things
    • Brian and Ted out at ApacheCon? 10/9-10/13

  • Sticky plan
    • we need to put some effort into merging the old Cosmo and old Scooby UIs

  • Magic URL's
    • a status check turned into a bigger conversation where it became clear that we were still not in agreement
    • Brian was unclear about the design requirements for this feature. Priscilla to respost the design session notes and workflows to cosmo-dev

Status

Ted

  • Progress
    • Hiring - phone screens and second interviews
    • Hired Travis
    • Got bugilla components merged and bugs retargeted
    • Worked with Simdesk and Randy to get (C)CLA's
    • Provided feedback to PJE on EIM
    • Estimation and calendar date discussions for Cosmo 0.5 on cosmo-dev
    • Google Summer of Code final evaluation for OSAF
    • Started to close out open e-mail threads
    • Got cosmo-private up and running
  • Plan
    • Start writing cosmo-dev mailing list summary
    • Hiring
    • In person at 543 Howard Street

Brian

  • Progress
  • Plan

Bobby

  • Progress
    • kiloprop - hibernate IS faster
    • Last remaining bits of Scooby --> Cosmo merge that were blocked by hibernate merge DONE.
  • Plan
    • Work on new features!

Matthew

  • Progress
    • Phone interviews for Web UI dev position
    • Finished basic lozenge work
    • hsv2rgb/rgb2hsv patches and tests for Dojo
    • Final date code and tests to Dojo
    • Started jump-to date
    • VMWare Server installed
  • Plan
    • Phone interview for Web UI dev candidate
    • Finish jump-to date
    • Mailto links
    • Install WinXP?/IE7 and start testing

Bear

  • Progress
    • Merged simdesk hibernate work from the sandbox repository to the server repository
    • Updated cosmo tinderbox config to match new build requirements
  • Plan
    • Enable functional tests in tinderbox

Priscilla

  • Progress
    • Merge Scooby/Cosmo content into Cosmo Home wiki page. Waiting for feedback for first draft.
    • Work with Ted on Cosmo planning. Create more accurate time estimates/dev might have questions on stickie plan features.
    • Need to follow up with updating the Scooby 0.3 specs to Cosmo 0.5 - starting this week.
    • D/F file bugs for Chandler based on D/F notes.
    • Competitive analysis/business model proposal
    • Interview and write up coming up this week.

  • Plans
    • Continue working with Ted/Sheila on Cosmo planning and roadmap.
    • Continue working with Ted to plan a more accurate Cosmo 0.5 release date
    • Working with Sheila/Ted and follow up on next steps of the Cosmo roadmap. Sheila’s Cosmo stickie plan
    • Still working through the punchlist of non-developement tasks, sent it to the list and updating my progress
    • Wiki/portal project proposal to send to general list - will start to investigate twiki and portal pages Ted/Mimi did
    • Start to work on the rest of the target user write ups

Jared

  • Progress
    • Developed testing framework which can run identical Cosmo performance tests on any set of svn revisions, retroactively to previous versions (in case a given test wasn't in the tbox tests for instance)
    • Prepared a relatively authoritative performance report comparing last JCR Cosmo to latest post-Hibernate-merge Cosmo
    • Contrib minor patch to kiloprop
    • Got osaf.us certificate purchased
    • Flesh out osaf.us placeholder site; move to proxying to cosmo-demo instead of scooby-demo
    • Pushed back most roadmap stuff past Hosted Service M2.
    • Updated Cosmo sticky plans with pre-Preview admin/hosted-service features
    • Proposed "at least one admin sticky per alpha release" plan to ProjMgr/ProdMgr/EngMgr; seems like basic consensus.
  • Plans
    • Preview sizing plans: Get to 1) a target Preview number-of-users; 2) a test which approximates the load of N number of users; then 3) an estimate of number of servers required at Preview. If >1 server needed, ensure multiple-db and multiple-app features are pre-Preview features
    • Install osaf.us prototype VM server into colocation facility
    • Additional roadmap info at http://osaf.us/project/roadmap/

Travis

  • Progress
    • Learning Dojo/ AJAX/ CMP/ etc. in preparation for the destrutification of Cosmo
  • Plans
    • Add logging to HTTP transactions

-- TedLeung - 11 Sep 2006

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r15 < r14 < r13 < r12 < r11 | More topic actions
 