Community Working Group Meeting 3 August 2004
Meeting canceled this week, deferred to
next week.
- Ted to start coordinating with working groups re PyCon goals.
- Pieter and Ducky to work with the working groups to come up with a format and technology infrastructure for rolling up status reports.
- Pieter or Ducky to talk to Katie about status reporting once we have all the technology in place.
- Ducky and Pieter to work together to get the copyright notice at the bottom of all wiki pages and on the wiki registration form.
- Ducky and Pieter to follow up with Jürgen about getting a permanent link for the contributor script.
- Ducky to follow up with Jürgen about the Named Includes plugin.
- Ducky to investigate gmane's challenge policy.
- Ducky to continue looking into VOIP and collaborative real-time editing, including for conferencing.
- Ducky to write up first pass of Community FAQ.
- Mitchell to present the Creative Commons license rationale to Mitch.
- Mitchell to put out a draft contributor license soon.
- Mitchell to decide if she needs to put out a separate draft contributor license specifically for PyLucene.
--
DuckySherwood - 29 Jul 2004