This page consolidates the status of all the different projects.
- Completed milestone : 0.5.03 - June 2nd, 2005 - see 0.5.03 Closing Status?
- Next milestone : 0.5.04 - July 7th, 2005
- Scheduled milestone : 0.5.05 - August 17th, 2005
- Check also Chandler's Milestones
May 24 Status
| Person | Progress | Plans | Other (OOF, questions) |
| Morgen | Checkin for filtered shares and account/cxn bug fix | Bug reviews, finish filtered shares | |
| Jeffrey | Architecture for recurrence - spec in progress | Spec checkin before SVN move; talk to Bryan Stearns and Ted about API | |
| Mike | Subversion conversion planning and preparation; completed several import upgrades (Python, etc) | Subversion move Wed May 25, cosmo 0.2 tinderbox with Maven, work with Aparna to get Silk tests to report to Tinderbox | |
| Phillip | Checked in basic Schema API integration with parcel loader | Class and attribute integration with parcel XML; make these changes safe for bulk unit test runs (TestRunner?) by having tests clean up after themselves; investigate repository unit tests running in same process; porting parcels to use Schema API | |
| Brian | Working with JP at Twisted to get changes committed -- writing unit tests to demonstrate acceptability; working with Katie on i18n architecture specifics and 0.6 i18n tasks | Code review Thursday on big bang email checkin | |
| Heikki | Certificate management tasks for this milestone checked in (query parts reviewed by Ted) | Add support for going to new server and seeing cert you don't know; thinking about accessibility; thorough review of cert store code after milestone | |
| Aparna | D conf demo for Mitch involved sharing testing; performance test planning with Katie (1000 and 3000 event calendar) | more work on performance testing data sample | |
| Grant | Bunches of unit tests for HTTP/DAV client library; decided not to bring into Twisted immediately | ETags and integrating into Chandler | |
| Lisa | | | OOF at Projects.Calconnect May 31-Jun 3 |
Bugzilla status by person (shows only tasks that have been entered in Bugzilla):
Design (from DesignToDoList?)
Build (from BuildProject?)
| Task | People | Bugs | Status | Milestone | SWAG |
| Convert Bonsai to SVN | MikeT | | In Progress | 0.5.04 | medium |
| Quality checkpoint infrastructure | MikeT | Bug:2824 | In Progress | 0.5.03 | small |
| Trim Twisted install size | MikeT | Bug:2216 | | 0.5.04 | small |
| startup unit test | HeikkiToivonen? | Bug:1822 | | 0.6 | medium |
| Projects.OpenSSL upgrade | HeikkiToivonen? | | Done | 0.6 | medium |
| Linux platform story | MikeT | | | 0.6 | large |
| Python upgrade | MikeT | Bug:2851 | Done | 0.5.03 | small |
| Move to Subversion | MikeT | | Done | 0.5.03 | large |
| Move IRCD to new server | MikeT | | Done | 0.5.03 | small |
| Cosmo Tinderbox client | MikeT | Bug:2903 | Done | 0.5.03 | medium |
| Tiger build issues | MikeT | Bug:3015 | Done | 0.5.03 | medium |
| Move Tinderbox server to new server | MikeT | Bug:3017 | Done | 0.5.03 | medium |
| wxPython upgrade | DavidSurovell? | | Done | 0.6 | medium |
| Twisted upgrade | MikeT | Bug:2308 | Done | 0.6 | small |
| SWIG upgrade | MikeT | Bug:2641 | Done | 0.6 | medium |
| M2Crypto to external | HeikkiToivonen? | | Done | 0.5.03 | medium |
| Instrumentation framework | MikeT | | | 0.6 |
| Move to Fedora Core 4 | MikeT | | | 0.6 |
| Breaking dependencies to self-built libs | MikeT | | | 0.6 |
| Get Linux distros to package Chandler | MikeT | | | 0.7 |
| Make Chandler available on more than one Linux distro | MikeT, RobinDunn? | | | 0.7 |
Plans for 0.4 Integration Point A
| Goal | Status |
| Prepare presentation and demo for OSCON 2004 | done |
Plans for Milestone 0.3.21
Plans for 0.4 Integration Point B
Plans for 0.4 Release
| Goal | Status |
| Prepare presentation and demo for Web 2 conference | not started |
| Prepare presentation and demo for EDUCAUSE 2004 | not started |
Cross-project status
EngineeringIssues doesn't yet have status by milestones, but might someday.
We don't have a good status page for IT, but see
EngineeringRequestsForIT?.
--
DuckySherwood? - 06 Jul 2004