This is a snapshot of the CurrentCombinedStatus as of Tue May 31 10:56:09 2005

Current Combined Status

This page consolidates the status of all the different projects.


Apps (from ApplicationProject)

  • Next milestone : 0.5.03 - May 30th, 2005 - Days left to milestone : 11
  • Scheduled milestone : 0.5.04 - TBD
  • Check also Chandler's Milestones


Services (from ServicesWorkingGroup)

May 24 Status

Person Progress Plans Other (OOF, questions)
Morgen Checkin for filtered shares and account/cxn bug fix Bug reviews, finish filtered shares  
Jeffrey Architecture for recurrence - spec in progress Spec checkin before SVN move; talk to Bryan Stearns and Ted about API  
Mike Subversion conversion planning and preparation; completed several import upgrades (Python, etc) Subversion move Wed May 25, cosmo 0.2 tinderbox with Maven, work with Aparna to get Silk tests to report to Tinderbox  
Phillip Checked in basic Schema API integration with parcel loader Class and attribute integration with parcel XML; make these changes safe for bulk unit test runs (TestRunner?) by having tests clean up after themselves; investigate repository unit tests running in same process; porting parcels to use Schema API  
Brian Working with JP at Twisted to get changes committed -- writing unit tests to demonstrate acceptability; working with Katie on i18n architecture specifics and 0.6 i18n tasks Code review Thursday on big bang email checkin  
Heikki Certificate management tasks for this milestone checked in (query parts reviewed by Ted) Add support for going to new server and seeing cert you don't know; thinking about accessibility; thorough review of cert store code after milestone  
Aparna D conf demo for Mitch involved sharing testing; performance test planning with Katie (1000 and 3000 event calendar) more work on performance testing data sample  
Grant Bunches of unit tests for HTTP/DAV client library; decided not to bring into Twisted immediately ETags and integrating into Chandler  
Lisa     OOF at Projects.Calconnect May 31-Jun 3

Bugzilla status by person (shows only tasks that have been entered in Bugzilla):


Repository (from RepositoryFramework)


Design (from DesignToDoList?)


Build (from BuildProject?)

Task People Bugs Status Milestone SWAG
Convert Bonsai to SVN MikeT   In Progress 0.5.04 medium
Quality checkpoint infrastructure MikeT Bug:2824 In Progress 0.5.03 small
Trim Twisted install size MikeT Bug:2216   0.5.04 small
startup unit test HeikkiToivonen? Bug:1822   0.6 medium
Projects.OpenSSL upgrade HeikkiToivonen?   Done 0.6 medium
Linux platform story MikeT     0.6 large
Python upgrade MikeT Bug:2851 Done 0.5.03 small
Move to Subversion MikeT   Done 0.5.03 large
Move IRCD to new server MikeT   Done 0.5.03 small
Cosmo Tinderbox client MikeT Bug:2903 Done 0.5.03 medium
Tiger build issues MikeT Bug:3015 Done 0.5.03 medium
Move Tinderbox server to new server MikeT Bug:3017 Done 0.5.03 medium
wxPython upgrade DavidSurovell?   Done 0.6 medium
Twisted upgrade MikeT Bug:2308 Done 0.6 small
SWIG upgrade MikeT Bug:2641 Done 0.6 medium
M2Crypto to external HeikkiToivonen?   Done 0.5.03 medium
Instrumentation framework MikeT     0.6
Move to Fedora Core 4 MikeT     0.6
Breaking dependencies to self-built libs MikeT     0.6
Get Linux distros to package Chandler MikeT     0.7
Make Chandler available on more than one Linux distro MikeT, RobinDunn?     0.7


Community (from CommunityHome)

Plans for 0.4 Integration Point A

Goal Status
Prepare presentation and demo for OSCON 2004 done

Plans for Milestone 0.3.21

Goal Status
Change copyright notice on wiki and web to Creative Commons 80% done
Create consolidated status report wiki page done
Improve wiki fonts, borders done

Plans for 0.4 Integration Point B

Goal Status
   

Plans for 0.4 Release

Goal Status
Prepare presentation and demo for Web 2 conference not started
Prepare presentation and demo for EDUCAUSE 2004 not started


Cross-project status

EngineeringIssues doesn't yet have status by milestones, but might someday.

We don't have a good status page for IT, but see EngineeringRequestsForIT?.

-- DuckySherwood? - 06 Jul 2004

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r8 < r7 < r6 < r5 < r4 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.