This is a snapshot of the CurrentCombinedStatus as of Mon Jan 24 07:00:01 2005

Current Combined Status

This page consolidates the status of all the different projects.


Apps (from ApplicationProject)

0.4.04 milestone

  • WxPythonProject?: widgets 2.5.3 (David) done
  • WxPythonProject?: swig integration (David) done
  • CpiaFramework?: printing review (Jed) major printing bugs fixed
  • CpiaFramework?: detail view using view delegation and attribute editor framework (Donn/Bryan/John) ready to check in
  • WxPythonProject?: native header strategy (David) strategy in place

Plan for 0.4.05 milestone

  • WxPythonProject?: xp theme (David) build problems still being resolved
  • CpiaFramework?: phase 1 of sidebar (item collections in sidebar) (John) not done
  • DeveloperPlatformProject?: zaobao content model update (Katie) not done
  • CalendarBlocksProject?: calendar view navigation (day-week) (Katie) not done
  • CpiaFramework?: SWIG and check in mini-calendar (Jed) still working on a few challenges with the build
  • CpiaFramework?: review for printing and mini calendar (Jed) done
  • CpiaFramework?: detail view using attribute editors and view delegation (Bryan/Donn) done

Plan for 0.4.06 milestone

  • WxPythonProject?: native header widget (David)


Services (from ServicesWorkingGroup)

Status for milestone 0.04.05: (11 Jan)

  • Mike: OSX installer checked in about to checkin
  • Mike: Linux/RPM installer deal with repository directory In progress
  • Mike: Build/installer bugs to clean up
  • Mike: Tinderbox scripts for perf data installed and putting out numbers Done
  • Brian: Make i18n proposal (post to dev list) Not Done
  • Brian: Get with Ted to finalize Query Broker proposal Done
  • Brian: Check in email attachments work Done by Friday with complete API including additional mail reading functionality and service code refactor / cleanup
  • Morgen: Sharing rewrite should go into tree by 11 Jan but not yet hooked into GUI Done
  • Morgen: Review ACL client API proposal ?
  • Heikki: Switch Chandler to newer M2Crypto+Twisted Done
  • Heikki: Possibly update Twisted to latest Not Done
  • Heikki: proof-of-concept ACL implementation (not checked in) Done?
  • Jeffrey: Checked in Test menu iCalendar import, updated vobject Done done just after 0.4.05, actually
  • Aparna: TBD

Plans for milestone 0.04.06: (25 Jan)

  • Jeffrey: Integrate iCalendar import code with Morgen's iCalendar sharing
  • Jeffrey: Get rudimentary VTODO and VJOURNAL import working
  • Jeffrey: Write basic export of Events and Tasks to iCalendar
  • Morgen: Better sharing network error handling
  • Morgen: Share iCalendar outgoing (publish as well as consume)
  • Morgen: Have a plan for what to do about mixed format sharing in a single collection
  • Brian: Unit tests for attachments
  • Brian: Integrate MIME torture tests
  • Brian: Proposal for I18N floating around for review
  • Phillip: Follow up on proposals for unit testing and directory layout, possibly stamping proposal
  • Mike: TBD
  • Heikki: TBD

Bugzilla status by person (shows only tasks that have been entered in Bugzilla):


Repository (from RepositoryFramework)

Task name/info Status Milestone
Query support for item collections/sharing ~2T (High) In Progress  
Performance ~4A + ~2T (High) In progress
Version Merging improvements ~3A (High) In Progress
Date/time support in data model ~2T (Med) Not started
Deletion/memory ~1A (Med) Not started
pinning Done  
cloud deletion Not started
Data model API review: what is the public API? ~2T (Med) Not started


Design (from DesignToDoList?)


Build (from BuildProject?)

Task People Bugs Status Milestone SWAG
Automate compiled code changes and uploads HeikkiToivonen? Bug:1453 coding done, need to order hardware 0.4.03 medium
startup unit test HeikkiToivonen? Bug:1822     medium
Installers MikeT Bug:600 Bug:601 Bug:602     large
Trim Twisted install size MikeT Bug:2216     small


Community (from CommunityHome)

Plans for 0.4 Integration Point A

Goal Status
Prepare presentation and demo for OSCON 2004 done

Plans for Milestone 0.3.21

Goal Status
Change copyright notice on wiki and web to Creative Commons 80% done
Create consolidated status report wiki page done
Improve wiki fonts, borders done

Plans for 0.4 Integration Point B

Goal Status
   

Plans for 0.4 Release

Goal Status
Prepare presentation and demo for Web 2 conference not started
Prepare presentation and demo for EDUCAUSE 2004 not started


Cross-project status

EngineeringIssues doesn't yet have status by milestones, but might someday.

We don't have a good status page for IT, but see EngineeringRequestsForIT?.

-- DuckySherwood? - 06 Jul 2004

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r8 < r7 < r6 < r5 < r4 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.