This is a snapshot of the CurrentCombinedStatus as of Mon Dec 27 07:00:01 2004

Current Combined Status

This page consolidates the status of all the different projects.


Apps (from ApplicationProject)

0.4.03 milestone

  • WxPythonProject?: widgets 2.5.3 (David) waiting for check in
  • WxPythonProject?: swig integration (David) ready to go with 2.5.3 build
  • CpiaFramework?: printing review (Jed) major printing bugs fixed
  • CpiaFramework?: mini calendar design (Jed) done
  • CpiaFramework?: first pass at view delegation (John) done
  • CpiaFramework?: first pass at attribute editor framework (Donn) done
  • CpiaFramework?: improved layout (Bryan) done
  • DetailViewProject?: reminders (Bryan) done
  • DeveloperPlatformProject?: concrete plan (Katie) done
  • CalendarBlocksProject?: calendar design/review (Katie) not done

Plan for 0.4.04 milestone

  • WxPythonProject?: native header strategy (David)
  • CpiaFramework?: review for printing and mini calendar (Jed)
  • CpiaFramework?: SWIG and check in mini-calendar (Jed)
  • CpiaFramework?: detail view using view delegation and attribute editor framework (Donn/Bryan/John)
  • DeveloperPlatformProject?: zaobao content model update (Katie)
  • CalendarBlocksProject?: calendar design/review, calendar view navigation (day-week) (Katie)


Services (from ServicesWorkingGroup)

Status for milestone 0.4.03:

  • Heikki: M2Crypto Done but bug related to mail code
  • Heikki: read ACL RFC; research existing ACL models In Progress
  • Brian: Finish unit tests and code reviews for WakeupCaller: Done
  • Brian: Design discussions on email attachments In progress
  • Brian: design discussions notifications Significant progress
  • Morgen: Have a plan for fitting Chandler schema to Projects.WebDAV data model Significant progress
  • Jeffrey: Get RRULES integrated In progress (more work than expected)
  • Jeffrey: Do external object wrapper In progress
  • Jeffrey: Get VObject into build Not done
  • Jeffrey: talk to Morgen about putting iCalendar on server Done
  • Aparna: Work on smoke test instructions integration into bugzilla In Progress
  • Mike: Checkin installer code
    • windows: Done
    • linux/RPM: Done (prototype)
    • osx: Pending

Plans for milestone 0.4.04: (21 December)

  • Mike: OSX installer checked in
  • Mike: linux/rpm installer deal with repository directory
  • Aparna: one more update on smoke test instructions
  • Brian: Proposal for item query/notifications
  • Brian: email "guinea pig" code for item query/notifications
  • Brian: Work with Ken on i18n
  • Brian: Progress on email attachments design discussions
  • Heikki: Twisted integration in M2Crypto
  • Heikki: Choose library to add ACL support to
  • Heikki: Figure out the API we need to create to support ACLs
  • Morgen: tbd
  • Jeffrey: More triage on RRULEs stuff (what not to implement)
  • Jeffrey: prototype of importing very simple iCal files into repository
  • Jeffrey: Get VObject into build done but making makefile work

Bugzilla status by person (shows only tasks that have been entered in Bugzilla):


Repository (from RepositoryFramework)

Task name/info Status Milestone
Query support for item collections/sharing ~2T (High) In Progress  
Performance ~4A + ~2T (High) In progress
Version Merging improvements ~3A (High) In Progress
Date/time support in data model ~2T (Med) Not started
Deletion/memory ~1A (Med) Not started
pinning Done  
cloud deletion Not started
Data model API review: what is the public API? ~2T (Med) Not started


Design (from DesignToDoList?)


Build (from BuildProject?)

Task People Bugs Status Milestone SWAG
Automate compiled code changes and uploads HeikkiToivonen? Bug:1453 coding done, need to order hardware 0.4.03 medium
startup unit test HeikkiToivonen? Bug:1822     medium
Installers MikeT Bug:600 Bug:601 Bug:602     large
Trim Twisted install size MikeT Bug:2216     small


Community (from CommunityHome)

Plans for 0.4 Integration Point A

Goal Status
Prepare presentation and demo for OSCON 2004 done

Plans for Milestone 0.3.21

Goal Status
Change copyright notice on wiki and web to Creative Commons 80% done
Create consolidated status report wiki page done
Improve wiki fonts, borders done

Plans for 0.4 Integration Point B

Goal Status
   

Plans for 0.4 Release

Goal Status
Prepare presentation and demo for Web 2 conference not started
Prepare presentation and demo for EDUCAUSE 2004 not started


Cross-project status

EngineeringIssues doesn't yet have status by milestones, but might someday.

We don't have a good status page for IT, but see EngineeringRequestsForIT?.

-- DuckySherwood? - 06 Jul 2004

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r8 < r7 < r6 < r5 < r4 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.