r8 - 13 Jul 2007 - 11:05:57 - MimiYinYou are here: OSAF >  Journal Web  > CombinedStatusSnapshot20041203
This is a snapshot of the CurrentCombinedStatus as of Fri Dec 3 11:18:09 2004

Current Combined Status

This page consolidates the status of all the different projects.


Apps (from ApplicationProject)

Plan for 0.4.02 milestone

Other work in 0.4.02 milestone

  • CpiaFramework: work on attribute editor framework (John, Donn and Bryan)

Plan for 0.4.03 milestone


Services (from ServicesWorkingGroup)

Status for milestone 0.5.02 (Nov 23): (Note Brian's tasks are completely blocked on Twisted patch integration)

  • Heikki: finished coding for tarball changes; worked on build footprint Done
  • Heikki: at the beginning of M2Crypto and Twisted integration (rather than done, as he'd like to be): Not Done (stuck and talking to various people)
  • Heikki: Getting windows build machine working Done
  • Mike: Fixed Linux launcher Done
  • Mike: First version of Windows installer - code review and checked in Done
  • Brian: submit patches to Twisted Done
  • Brian: refactored a bunch of email code depending on the Twisted patches
  • Brian: overhaul Email content model
  • Brian: proposal for Item Collection and notification stuff: Not done - working with Ted
  • Jeffrey: API solidifying
  • Jeffrey: Considering how to ship an Olsen db of timezones. Waiting on Chao
  • Aparna: involved in design reviews to write ZeroPointFiveTestSpec In progress

Tasks originally not scheduled:

  • Brian: rewrite ScheduleManager? (now WakeupCaller) and make it work with synch, email, zaobo: Done except for code review, unit tests
  • Heikki: verified certificate chain in SSL: Done
  • Aparna: Tested Mike's new installer: Done

Plans/Status for milestone 0.5.03:

  • Heikki: M2Crypto In progress - proof of concept checked in
  • Heikki: read ACL RFC; research existing ACL models In Progress
  • Brian: Finish unit tests and code reviews for WakeupCaller: Fixed bugs, no code review yet
  • Brian: Design disussions on email attachments and notifications In progress
  • Morgen: Have a plan for fitting Chandler schema to Projects.WebDAV data model
  • Jeffrey: Get RRULES integrated
  • Jeffrey: Do external object wrapper
  • Jeffrey: Get VObject into build
  • Jeffrey: talk to Morgen about putting iCalendar on server Done
  • Aparna: Work on smoke test instructions integration into bugzilla
  • Mike: Checkin installer code
    • windows: Done
    • linux: In Progress
    • osx: Pending

Bugzilla status by person (shows only tasks that have been entered in Bugzilla):


Repository (from RepositoryFramework)

Task name/info Status Milestone
Query support for item collections/sharing ~2T (High) Not started  
Performance ~4A + ~2T (High) In progress
Version Merging improvements ~3A (High) Not started
Date/time support in data model ~2T (Med) Not started
Deletion/memory ~1A (Med) Not started
pinning Done  
cloud deletion Not started
Data model API review: what is the public API? ~2T (Med) Not started


Design (from DesignGroupMilestones)

By Integration Point "B"

  • Complete first draft of production projects for following:
    • Rule builder
    • Dashboard view
    • Universal text entry box
  • Brainstorm and scope search
  • Conduct lightweight (concept and paper prototype) usability tests


Build (from BuildProject?)

Task People Bugs Status Milestone SWAG
Automate compiled code changes and uploads HeikkiToivonen? Bug:1453 coding done, need to order hardware 0.4.03 medium
startup unit test HeikkiToivonen? Bug:1822     medium
Installers MikeT Bug:600 Bug:601 Bug:602     large
Trim Twisted install size MikeT Bug:2216     small


Community (from CommunityHome)

Plans for 0.4 Integration Point A

Goal Status
Prepare presentation and demo for OSCON 2004 done

Plans for Milestone 0.3.21

Goal Status
Change copyright notice on wiki and web to Creative Commons 80% done
Create consolidated status report wiki page done
Improve wiki fonts, borders done

Plans for 0.4 Integration Point B

Goal Status
   

Plans for 0.4 Release

Goal Status
Prepare presentation and demo for Web 2 conference not started
Prepare presentation and demo for EDUCAUSE 2004 not started


Cross-project status

EngineeringIssues doesn't yet have status by milestones, but might someday.

We don't have a good status page for IT, but see EngineeringRequestsForIT?.

-- DuckySherwood? - 06 Jul 2004

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r8 < r7 < r6 < r5 < r4 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.