This is a snapshot of the
CurrentCombinedStatus as of Fri Dec 3 11:18:09 2004
Current Combined Status
This page consolidates the status of all the different projects.
Plan for 0.4.02 milestone
Other work in 0.4.02 milestone
- CpiaFramework: work on attribute editor framework (John, Donn and Bryan)
Plan for 0.4.03 milestone
Status for milestone 0.5.02 (Nov 23):
(Note Brian's tasks are completely blocked on Twisted patch integration)
- Heikki: finished coding for tarball changes; worked on build footprint Done
- Heikki: at the beginning of M2Crypto and Twisted integration (rather than done, as he'd like to be): Not Done (stuck and talking to various people)
- Heikki: Getting windows build machine working Done
- Mike: Fixed Linux launcher Done
- Mike: First version of Windows installer - code review and checked in Done
- Brian: submit patches to Twisted Done
- Brian: refactored a bunch of email code depending on the Twisted patches
- Brian: overhaul Email content model
- Brian: proposal for Item Collection and notification stuff: Not done - working with Ted
- Jeffrey: API solidifying
- Jeffrey: Considering how to ship an Olsen db of timezones. Waiting on Chao
- Aparna: involved in design reviews to write ZeroPointFiveTestSpec In progress
Tasks originally not scheduled:
- Brian: rewrite ScheduleManager? (now WakeupCaller) and make it work with synch, email, zaobo: Done except for code review, unit tests
- Heikki: verified certificate chain in SSL: Done
- Aparna: Tested Mike's new installer: Done
Plans/Status for milestone 0.5.03:
- Heikki: M2Crypto In progress - proof of concept checked in
- Heikki: read ACL RFC; research existing ACL models In Progress
- Brian: Finish unit tests and code reviews for WakeupCaller: Fixed bugs, no code review yet
- Brian: Design disussions on email attachments and notifications In progress
- Morgen: Have a plan for fitting Chandler schema to Projects.WebDAV data model
- Jeffrey: Get RRULES integrated
- Jeffrey: Do external object wrapper
- Jeffrey: Get VObject into build
- Jeffrey: talk to Morgen about putting iCalendar on server Done
- Aparna: Work on smoke test instructions integration into bugzilla
- Mike: Checkin installer code
- windows: Done
- linux: In Progress
- osx: Pending
Bugzilla status by person (shows only tasks that have been entered in Bugzilla):
| Task name/info | Status | Milestone |
| Query support for item collections/sharing ~2T (High) | Not started | |
| Performance ~4A + ~2T (High) | In progress |
| Version Merging improvements ~3A (High) | Not started |
| Date/time support in data model ~2T (Med) | Not started |
| Deletion/memory ~1A (Med) | Not started |
| pinning | Done | |
| cloud deletion | Not started |
| Data model API review: what is the public API? ~2T (Med) | Not started |
By Integration Point "B"
- Complete first draft of production projects for following:
- Rule builder
- Dashboard view
- Universal text entry box
- Brainstorm and scope search
- Conduct lightweight (concept and paper prototype) usability tests
Build (from BuildProject?)
Plans for 0.4 Integration Point A
| Goal | Status |
| Prepare presentation and demo for OSCON 2004 | done |
Plans for Milestone 0.3.21
Plans for 0.4 Integration Point B
Plans for 0.4 Release
| Goal | Status |
| Prepare presentation and demo for Web 2 conference | not started |
| Prepare presentation and demo for EDUCAUSE 2004 | not started |
Cross-project status
EngineeringIssues doesn't yet have status by milestones, but might someday.
We don't have a good status page for IT, but see
EngineeringRequestsForIT?.
--
DuckySherwood? - 06 Jul 2004