This is a snapshot of the CurrentCombinedStatus as of Mon Nov 8 07:00:21 2004

Current Combined Status

This page consolidates the status of all the different projects.


Apps (from ApplicationProject)

  • Working on tech documentation (tracked in bugzilla, docs on wiki)
  • Planning .5 tasks (bottom up list and estimates)
    • wxPythonProject: WxPythonProjectZeroPointFivePlanning? (David and Jed)
    • CpiaFramework: cpia list (John and Donn)
    • developer dogfood (Katie, Ted and Morgen)
    • EngineeringIssues: general list of miscellaneous engineering issues (Katie)
    • calendar and other ZeroPointFivePlanning apps requirements (whole team)
  • Working on .5 bugs that were punted from .4


Services (from ServicesWorkingGroup)

Plan for milestone 0.4.01 (Nov 9)

  • Brian: Adding SMTP type to exceptions in Twisted
  • Brian: Fix Timeout logic in Twisted
  • Brian: Clean code based on code review
  • Brian: Determine if a way to automate deferred callback and views
  • Brian: Continue working with Barry Warsaw to get a standard email address validator in to standard dist of Python
  • Brian: Refactor mail code to get API logic out of Mail Content Model and CPIA callbacks out of Mail Service.
  • Heikki: M2Crypto + Twisted integration

Bugzilla status by person (shows only tasks that have been entered in Bugzilla):


Repository (from RepositoryFramework)

Plan for (3.26) [10/19]

  • Documentation


Design (from DesignGroupMilestones)

By Integration Point "B"

  • Complete first draft of production projects for following:
    • Rule builder
    • Dashboard view
    • Universal text entry box
  • Brainstorm and scope search
  • Conduct lightweight (concept and paper prototype) usability tests


Build (from BuildProject?)

0.5 (ZeroPointFive?) Goals


Community (from CommunityHome)

Plans for 0.4 Integration Point A

Goal Status
Prepare presentation and demo for OSCON 2004 done

Plans for Milestone 0.3.21

Goal Status
Change copyright notice on wiki and web to Creative Commons 80% done
Create consolidated status report wiki page done
Improve wiki fonts, borders done

Plans for 0.4 Integration Point B

Goal Status
   

Plans for 0.4 Release

Goal Status
Prepare presentation and demo for Web 2 conference not started
Prepare presentation and demo for EDUCAUSE 2004 not started


Cross-project status

EngineeringIssues doesn't yet have status by milestones, but might someday.

We don't have a good status page for IT, but see EngineeringRequestsForIT?.

-- DuckySherwood? - 06 Jul 2004

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r7 < r6 < r5 < r4 < r3 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.