This is a snapshot of the
CurrentCombinedStatus as of Mon Oct 25 07:00:22 2004
Current Combined Status
This page consolidates the status of all the different projects.
- Working on tech documentation (tracked in bugzilla, docs on wiki)
- Planning .5 tasks (bottom up list and estimates)
- wxPythonProject: widgets list (David and Jed)
- CpiaFramework: cpia list (John and Donn)
- developer dogfood (Katie, Ted and Morgen)
- EngineeringIssues: general list of miscellaneous engineering issues (Katie)
- calendar and other ZeroPointFivePlanning apps requirements (whole team)
- Working on .5 bugs that were punted from .4
Plan for milestone 0.3.27
- Major goal: converge/maintain zero bugs
- Brian: Code reviews
- Stuart: Fix bugs (count: 5) including possibly performance and unit tests
- Brian: Upgrade to latest Twisted with Brian's IMAP patch
- Brian: Document email model (bug #?)
- Aparna: continued testing
Results for milestone 0.3.26 (code freeze)
- Build: Heikki: Linux launcher bug, take 3
- Build: Get Jurgen to install some packages related to CVS
- 0.5 Planning, Heikki: Investigate Projects.WebDAV ACL support
- Release: Get more bug reports/charts working (Heikki)
- Stuart: Fix bugs (count: 10), improve unit tests, try not to break things Now 5 bugs
- Brian: Fix bugs (count: 4) Done: down to zero bugs
- Brian: Code reviews Planned Thurs Oct 7
- Brian: Fix a bunch of bugs in Twisted library
Bugzilla status by person (shows only tasks that have been entered in Bugzilla):
Plan for (3.26) [10/19]
By Integration Point "B"
- Complete first draft of production projects for following:
- Rule builder
- Dashboard view
- Universal text entry box
- Brainstorm and scope search
- Conduct lightweight (concept and paper prototype) usability tests
Build (from BuildProject?)
0.4 (ZeroPointFour?) Goals
- wxWidgets 2.5 migration - completed
- Dependencies don't work in all cases; fix them: (30 Apr) Medium
- Investigate switching away from CVS (Subversion, Perforce, ...): (21 May) Medium/Large
- Would obviously affect Bonsai, LXR, maybe other webtools
- Keep up to date with latest releases of 3rd party libraries: ongoing
- Try to reduce Chandler's dependancy of slightly modified 3rd party libs - try to get Chandler use the standard libs: (21 May) Medium/Large
- Automate more of the build and release process
- Smarter Tinderbox (performance reporting, separate release and debug builds, Bonsai links, ...): (28 May) Medium/Large
- Automatic checksums on download packages: - completed
- Keep Tinderbox in green - goal is to have outages last less than 6 hours at a time.
- And in general managing build & release bug list
- See also ReleaseEngineeringGoals20040309? meeting notes.
#Projects.ReleaseCommunityGoals
- Community-related goals:
- one or two more ports.
- Rationale: this helps verify we're not doing things that make porting hard. It also allows developers using othe distributions to participate.
- Steps to encourage: Have a list of past and existing ports. Have easy to find info on wht to do if one needs help.
- volunteers setting up more tinderboxes running on their machines that would report to our tinderbox which would display the results along with our tinderboxes.
- Rationale: This allows us to see run thorough build cycles with more options -- release and debug builds, some different options on each, and for each platform.
- Steps to encourage: get our infrastucture ready to accept data from other tinderboxes, and hopefully make it easy to add tinderboxes. Create a good set of information about why this is valuable, how to set up a tinderbox, how to send the data to us.
- evaluate build-related feedback from Projects.PyCon? and determine if there are easier or standardized ways that we should incorporate.
- find one or two people with lots of python build experience to make suggestions about build improvements
Plans for 0.4 Integration Point A
| Goal | Status |
| Prepare presentation and demo for OSCON 2004 | done |
Plans for Milestone 0.3.21
Plans for 0.4 Integration Point B
Plans for 0.4 Release
| Goal | Status |
| Prepare presentation and demo for Web 2 conference | not started |
| Prepare presentation and demo for EDUCAUSE 2004 | not started |
Cross-project status
EngineeringIssues doesn't yet have status by milestones, but might someday.
We don't have a good status page for IT, but see
EngineeringRequestsForIT?.
--
DuckySherwood? - 06 Jul 2004