r13 - 27 Mar 2007 - 14:28:58 - PhilippeBossutYou are here: OSAF >  Journal Web  >  DevelopmentHome > ApplicationProject > AppsMeeting20050412

Apps meeting 12 April 2005

Agenda

  • 0.6: Bug SWAG status
  • Specs & Documentation
  • Task Tracking
  • CSG Meeting: Coming up April 21st and 22th
  • Open Mike...

Meeting Notes

  • 0.6: Bug SWAG status
    • This is a first shot: the data are raw, don't take them too seriously... breeze deeply...
    • Just based on raw data though, we see that the amount of "bug fixing" is big: 1 to 2 months...
    • Ways to mitigate
      • Get everyone to use a development environment so that everyone can debug wxWidgets issues
      • Work with Mimi and Design so that we tweak the Design to be closer to existing Widgets instead of reinventing some when we don't need to
      • Use Robin as a resource for some of the general wxWidgets issues
  • Specs & Documentation
    • Sheila will own the Spec process: we (devs) still need to contribute to the spec writing though
    • Doc: Parcel tutorial needs a revision (in the CSG perspective). John and Alec will work on that.
  • Task Tracking & Processes
    • Bug bash: sort of irrelevant for Apps right now since we are basicaly in bug fix mode now...
    • Check points and milestones: sounds good. Philippe to put up a plan with the team and sync up with Lisa on an overall Chandler basis
    • Components to update: let's not forget that in the schedule: SWIG 1.3.24 and wxPython 2.5.5 of course (already assigned to David) but also Python, FC3 (or 4), OS X 10.4 (Tiger), Subversion, etc...
    • Use of Eclipse: John to spend a couple of days on this this week and report to the team. Hope is: we'll have a good usable X-platform environment to develop and debug the wxWidgets C++
  • CSG Meeting: Coming up April 21st and 22th. John and Alec to spend some time on this.

Actions

  • Philippe and the dev team will SWAG tasks for 0.6
  • Philippe to load balance and propose draft plan for the Apps team. Need to sync up with Lisa (master planner for 0.6)
  • Katie to set performance targets/goals for 0.6

Status

Philippe

  • Spent most of my time reviewing P1 and P2 bugs for 0.6
  • Started to dig into CPIA and wxWidgets
  • Phone screened candidates for Cosmo WebApp? project

John

Jed

  • Met w/ Mimi & Philippe to discuss UI work needed to satisfy our 0.6 goals. Planned weekly follow up meetings to track our progress.
  • Went over bugs w/ Philippe.
  • Tested out how far we can get towards Mimi's bevelling goals using only wx flags.
  • Started trying to add the kind of border Mimi wants to wxWidgets.

David

  • more Column Header work:
    • expanded and cleaned up selection UI
    • expanded docs
    • much polish in preparation of submittal to wxWidgets
  • reviewed bugs with Philippe
  • continued work on wxPython v2.5.[4,5]
  • wrote 5 HR reviews
  • for more info, see WxPythonProject

Alec

  • Lots more calendar features:
    • D-Shaped event items
    • rudimentary indentation for conflicting events
    • Bug: 2636 - removing today button
    • Bug: 2645 - background selection
  • Other calendar cleanup/refactoring
  • Began discussion with Jeffrey Harris about how to implement recurrence in our content model

Bryan

  • Reviewed and SWAGged all my bugs (and closed a couple of oldies)
  • Updated DetailViewProject
  • Wrote 7 peer reviews (still need to do my self-review, too)
  • Working on refactoring attribute editors and fixing their bugs
Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r13 < r12 < r11 < r10 < r9 | More topic actions
 
Open Source Applications Foundation
Except where otherwise noted, this site and its content are licensed by OSAF under an Creative Commons License, Attribution Only 3.0.
See list of page contributors for attributions.